Week 1 - Photos

  • First Pipe In  - 6/07/16
    First Pipe In - 6/07/16
  • First Insertion Pit - Water Street
    First Insertion Pit - Water Street
  • Open Excavation - Water Street Parking Lot. Effluent Pipe Shown at Bottom of Trench
    Open Excavation - Water Street Parking Lot. Effluent Pipe Shown at Bottom of Trench
  • Water Street Pump Station Force Main Retrofit
    Water Street Pump Station Force Main Retrofit