FY23 ATM CAPITAL REQUESTS & SPECIAL TM REQUESTS

AIRPORT

  1. Runway Environmental Assessment
  2. Airport Sewage Treatment Plant Upgrade
  3. Airport Hangar Insulation Replacement

FIRE

  1. Substantial Rehab of Station 5 (Manomet)
  2. Replace 1989 Tanker 1
  3. Rehab Engine 1
  4. Station 1 Compressor

INFORMATION TECHNOLOGY 

  1. Battery Replacement
  2. AssessPro Server Upgrade
  3. Upgrade and Normalize Active Directory Structure
  4. VOIP Implementation Completion
  5. Expand & Secure WLAN

INSPECTIONAL SERVICES IN COOPERATION W/IT

  1. Permitting Software/Hardware Upgrades

MARINE & ENVIRONMENTAL AFFAIRS

  1. Jenney Pond Dredging
  2. Re-Power MU-5
  3. Inspection of T-Wharf/Town Wharf
  4. Granby Lane Abatement/Demo/Cleanup

POLICE

  1. Mobile Data Terminal Replacement
  2. Crime Scene Services Vehicle
  3. Training Room A/V Upgrade

*SPECIAL TOWN MEETING*  Replacement of Patrol Boat Motors

PUBLIC WORKS

  • ADMINISTRATION
  1.  Road Preservation
  1. Court St. & Cherry St. Improvements
  2. Pavement Mgmt & ADA Compliance
  3. Manomet Ave Wicking Wells

*SPECIAL TOWN MEETING*  Route 80 Sidewalks

  1. Police Dept. HVAC Replacement
  2. Plumbing Upgrades
  3. Painting Upgrades
  1. Fleet Radios Update
  2. Vehicle Lifts
  3. Fuel Efficiency Program
  1. Replace Truck H345
  2. Replace 25 Ton Trailer
  3. Replace Truck H335
  4. Replace Truck H301

*SPECIAL TOWN MEETING*  Replace Sweeper H303

  1. Tennis Court Repair - Briggs Field & Elmer Raymond Playground
  2. Vehicle - 6-Wheel Truck
  3. Vehicle - 1-Ton Dump Truck

*SPECIAL TOWN MEETING*  Brewster Garden Stairs

  1. Office Container
  2. Containers/Dumpsters

WASTEWATER

  1. CMOM
  2. Effluent Baffle Wall
  3. Replace F250 Utility Truck
  4. Surf Rake 600HD Barber
  5. Greasezilla

*SPECIAL TOWN MEETING*  WSPS Flood Barrier Wall

*SPECIAL TOWN MEETING*  Water Street Interceptor

*SPECIAL TOWN MEETING* SCADA Improvements

WATER​​​

  1. Infrastructure Improvements
  2. Pump Station Upgrades
  3. Replace Pick-up Truck W-42

RECREATION

  1. Memorial Hall Sound System Upgrade

SCHOOL

  1. HVAC Replacement (SES)
  2. Roof Assessment w/ADA review (MES, CSES, HES, SES)
  3. Siding Assessment (SES, FFES)
  4. Repair Entry Way (WES)
  5. Phase III Window Replacement (FFES)
  6. Generator Replacement (SES)
  7. Window Replacement (IBES)
  8. Vehicle Replacement (DW)
  9. Replace Gymnasium Floor (PCIS)
  10. Replace Gymnasium Floor (HES)
  11. Replace Gymnasium Floor (NMES)
  12. Mill Pave and Line Lot (PSMS)
  13. Mill Pave and Line Lot w/Walkway Repair (CSES)